Mocke Pipeline Construction | High Quality HDPE Pipelines | Complete Pipeline Solutions
Mocke constructs and installs high quality HDPE pipelines using advanced methods in the least amount of time to ensure complete pipeline solutions.
High Quality HDPE Pipelines, Complete Pipeline Solutions
15052
page-template,page-template-full_width,page-template-full_width-php,page,page-id-15052,ajax_fade,page_not_loaded,,qode-title-hidden,qode-theme-ver-17.2,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.7,vc_responsive
mocke-pipeline-construction-solutions-headers-hdpe-pipelines

Mocke constructs High Density Polyethylene (HDPE) pipelines with advanced methods to ensure high quality pipelines in the least amount of time.

Long pipelines up to 1000 mm diameter and 25 bar pressure.

Mocke installs pumps and valves for a complete pipeline solution.

Mocke performs pipeline civil activities including excavation and filling, the building of chambers, thrust blocks and sleepers.

Download the HDPE Specification Sheet.

WHY IS HDPE BETTER THAN STEEL?

  • Fast installation
  • No corrosion protection
  • Simple NDT
  • Eliminate cathodic protection
  • Easy to handle
  • Good abrasion resistance
  • Longer life

WELDING METHODS USED BY MOCKE

  • High interfacial pressure butt fusion welding according to ISO 21307:2009(E) for large diameters and thick walls.
  • Extrusion welding for low pressure joints.
  • Electrofusion couplings for large diameters or in limited space.
  • Hot air welding.
  • IR (Infra Red for high purity applications)
  • Socket welding for small diameters.

mocke-pipeline-construction-images-hdpe-pipe
mocke-pipeline-construction-images-welding
mocke-pipeline-construction-image-butt-welding

APPLICATIONS

HDPE Pipelines are used in a variety of mining, water and wastewater, slurry, mine tailings, oil and gas, and chemical applications.

QUALITY GUARANTEE

Ensure the final quality of the installed pipe

  1. Independently tested raw material batches
  2. Independently tested extruded pipe
  3. Onsite automatic process and data logging
  4. Onsite weld testing
  5. Ultrasonic weld testing onsite to test for weld impurities

mocke-pipeline-construction-images-datalogger
mocke-pipeline-construction-images-testing-mc-elroy
mocke-pipeline-construction-images-testing
mocke-pipeline-construction-images-HDPE-piping-system
mocke-pipeline-construction-images-hdpe-de-watering
mocke-pipeline-construction-images-hdpe-plants
mocke-pipeline-construction-images-hdpe-slurry
mocke-pipeline-construction-images-hdpe-tailings-storage-facility
mocke-pipeline-construction-images-hdpe-bulk-water-supply

OTHER PLASTICS OPTIONS

Mocke constructs pipelines with other plastic materials and methods as required by the application. Mocke assists in the selection of the correct plastic material.

Including:

  • uPVC (Unplasticised Polyvinyl Chloride)
  • cPVC (Post Chlorinated Polyvinyl Chloride)
  • PP (Polypropylene)
  • PVDF (Polyvinylidene Fluoride)
  • PTFE (Polytetrafluoroethylene)
  • PFA (Perfluroalkoxy)
  • GRP (Glass Reinforced Plastic – Fibreglass)
  • nPE (Natural Polyethylene)
  • PEX (Cross Linked Polyethylene)
  • UHMWPE (Ultra High Molecular Weight Polyethylene)